Valid Premium Exam
https://premium.validexam.com/2022/06/26/q21-q37-get-100-passing-success-with-true-tae-exam-jun-2022/
Export date: Thu Sep 19 22:32:38 2024 / +0000 GMT

[Q21-Q37] Get 100% Passing Success With True TAE Exam! [Jun-2022]




Get 100% Passing Success With True TAE Exam! [Jun-2022]

BCS TAE PDF Questions - Exceptional Practice To ISTQB Certified Tester Advanced Level: Test Automation Engineer

Q21. You are currently designing the TAA of a TAS. You have been asked to adopt an approach forautomatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardwareand communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?

 
 
 
 

Q22. Which of the following statements does NOT describe good practice for maintaining the TAS?

 
 
 
 

Q23. You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the
11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?

 
 
 
 

Q24. Assume that you are the TAE responsible for the correct functioning of a TAS, deployed in a test environment that consists of a few machines running the same version of the operating system. The TAS has been working and stable since its deployment, it has been used to run an automated test suite consisting of many similar automated test. The infrastructure team is planning to update the operating system on these machines by installing a new the service pack for security reasons. Since the vendor of the operating system assurance full backward compatibility, the infrastructure team assurance that there will be no impacts on the functioning of the TAS.
What is the BEST approach to confirm the correct functioning of the TAS in this scenario?

 
 
 
 

Q25. Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.
Which of the following is NOT a consideration when designing for testability?

 
 
 
 

Q26. What is NOT a factor in considering when you are asked to ensure an effective transition from manual to automated tests?

 
 
 
 

Q27. Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

 
 
 
 

Q28. Which of the following is NOT a technical design consideration for a TAA?

 
 
 
 

Q29. You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

 
 
 
 

Q30. Consider A TAS for testing adesktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields( e.g text boxes).
What is the BEST recommendation for improving the TAS?

 
 
 
 

Q31. Which of the following BEST describes why it is important to separate test definition from test execution in a TAA?

 
 
 
 

Q32. A regression test suite consist of 500 test cases which are allexecuted manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lastedone month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.
Which of the following statements is TRUE in this scenario?

 
 
 
 

Q33. You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
Inthe pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.
Which of the following statements isTRUE?

 
 
 
 

Q34. Which of the following success factors for a test automation project is TRUE?

 
 
 
 

Q35. Consider a TAS that uses a keyword-driven framework. The SUT is a web application and there is a large set of keywords available for writingthe automated tests that relate to highly specific user actions linked directly to the GUI of the SUT. The automated test written with the keywords are statically analyzed by a custom tool which highlight’s repeated instances of identical sequence of keywords. The waiting mechanism implemented by the TAS for a webpage load is based on a synchronous sampling within a given timeout. The TAS allows checking a webpage load every seconds until a timeout value

 
 
 
 

Q36. Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

 
 
 
 

TAE dumps - ValidExam - 100% Passing Guarantee: https://www.validexam.com/TAE-latest-dumps.html 1

Links:
  1. https://www.validexam.com/TAE-latest-dumps.html
Post date: 2022-06-26 09:06:32
Post date GMT: 2022-06-26 09:06:32

Post modified date: 2022-06-26 09:06:32
Post modified date GMT: 2022-06-26 09:06:32

Export date: Thu Sep 19 22:32:38 2024 / +0000 GMT
This page was exported from Valid Premium Exam [ http://premium.validexam.com ]