QUESTION 24
The Employer has prepared a contract for a waste-to-energy project based on the FIDIC Yellow Book (edition
1999). You are preparing negotiations on behalf of one of the Subcontractors with the Contractor. The main Contractor will manage the design and build of the Works, whereby the Subcontractor will deliver critical systems regarding power generation and cooling. The Contractor intends to contract the main Contract back- to-back with the Subcontractor. In the proposed back-to-back subcontract, the following amendment is proposed through Particular Conditions:
” Sub-Clause 4.4. The following paragraph is added: The Subcontractor is required to scrutinize the Employer
‘ s Requirements in a manner identical to the obligations of the Contractor as stated in Sub-Clause 5.1 of the Main Contract. The Subcontractor will indemnify and hold harmless (up to the maximum liability of the Subcontractor) the Contractor with regard to any error, fault or other defect found in the Employer ‘ s Requirements, its items of reference or Contractor ‘ s design of the Works for the scope part for which Subcontractor is contracted. ” What is your advice to the Subcontractor (SC) in regard to entering this proposed subcontract?

 
 
 
 

QUESTION 25
(Under the FIDIC Red Book, which of the following statements are correct? [2017 Edition] (2 correct answers apply) Choose all of the correct answers (multiple possibilities).)

 
 
 
 
 

QUESTION 26
Is the Employer obliged under FIDIC Silver Book (edition 1999) to describe which Documents are to be submitted to the Employer? (1 correct response applies)

 
 
 
 

QUESTION 27
(For specific probable future events or circumstances which may adversely affect the Works, FIDIC Red and Yellow Books (edition 1999) provide a duty to notify specific parties. Which two statements are correct?
Choose all of the correct answers (multiple possibilities).)

 
 
 
 

QUESTION 28
(Under the FIDIC Yellow Book (edition 1999), any delay caused by Authorities will be considered as a cause of Delay under sub paragraph (b) of Sub-Clause 8.5 under the only condition that the Contractor has diligently followed the procedures laid down by the public authorities in the Country. Is this statement true or false?)

 
 

QUESTION 29
(Which two FIDIC Books (edition 2017) should especially be considered for use if the Employer needs the Contractor to take responsibility for the design and execution of the project. The construction will involve substantial work underground or work in other areas which tenderers cannot inspect.
Choose all of the correct answers (multiple possibilities).)

 
 
 
 

QUESTION 30
Under the FIDIC Construction Contract, which one of the following statements is correct?

 
 
 
 
 

QUESTION 31
Under the FIDIC Red, Yellow, and Silver Books (both editions), the Employer has an obligation to give a detailed notice to the Contractor about intended changes that are material to its financial arrangements.

 
 

QUESTION 32
(In the FIDIC Yellow Book (edition 1999), the Contractor has to provide the Engineer with documents as stated in Sub-Clause 5.2. Who is responsible for ensuring there is sufficient time allocated for reviewing these documents in relation to the Schedule of the Works?)

 
 
 

QUESTION 33
(Under FIDIC Red Book (edition 1999) a notice may be delivered to which two addresses?
Choose all of the correct answers (multiple possibilities).)

 
 
 
 

QUESTION 34
(Which one of the following statements is correct regarding the Employer ‘ s Representative under the FIDIC Silver Book (edition 1999)?)

 
 
 
 

QUESTION 35
Regarding the FIDIC Silver Book (both editions), if a part of the Works is to be paid according to quantity supplied or work done, appropriate provisions must be included in the Particular Conditions. Is this statement true or false?

 
 

QUESTION 36
Under the FIDIC Red Book, which one of the following statements is correct for a claim by the Contractor?

 
 
 
 
 

QUESTION 37
(You are the Contract Manager of the Employer ‘ s Representative in a Thermal Power Plant Project under FIDIC Silver Book (edition 2017). The Contractor submits two claims:
(1) USD 200,000 for additional costs due to an error in national piling standard NTS-PW-01 referenced in the Employer’s Requirements.
(2) USD 300,000 for constructing an additional flood wall due to incorrect hydrological data in Site Data (water level miscalculated).
What is your determination for the Contractor?)

 
 
 
 

QUESTION 38
Which one of the following statements is correct regarding the Provisional Sum under the FIDIC Red, Yellow, and Silver Books (edition 1999)?

 
 
 

QUESTION 39
Under the FIDIC Red Book (edition 1999), if the Contractor as per Sub-Clause 14.2 has to ensure the Employer receives an Advance Payment Guarantee as per the standard model, what type of instrument should this be?

 
 
 
 

QUESTION 40
Which of the following obligations are relevant to the Engineer ‘ s roles with regards to insurance? [2017 Edition] (2 correct answers apply) Choose all of the correct answers (multiple possibilities).

 
 
 
 

Pass CCM Tests Engine pdf – All Free Dumps: https://www.validexam.com/CCM-latest-dumps.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below